Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
Background.The objective of the present study is to verify whether using diuretics will improve either blood pressure or fluid overload in maintenance hemodialysis patients with residual diuresis kidney function.
Methods.46 maintenance hemodialysis patients will be given three stages of diuretic intervention: 100mg furosemide every day for 1 month, 200mg furosemide every day for 1 month, and 100mg furosemide combined with 25mg hydrochlorothiazide every day for 1 month. The 24-hour urine volume, 24-hour urine sodium, 24-hour urine potassium, blood pressure, OH(overhydration) and dry weight will be collected. OH will be measured by bioelectrical impedance.
Not provided
Not provided
Not provided
Not provided
| Label | Type | Description | Intervention Names |
|---|---|---|---|
| diuretics | Experimental |
|
| Name | Type | Description | Arm Group Labels | Other Names |
|---|---|---|---|---|
| Furosemid hydrochlorothiazide | Drug | furosemide 100mg for one month;furosemide 200mg for one month;furosemide 100mg and hydrochlorothiazide 25mg for one month; |
|
| Measure | Description | Time Frame |
|---|---|---|
| urine volume increasing after diuretic use in maintenance hemodialysis patients with residual renal function | up to 16 months |
Not provided
Not provided
Inclusion Criteria:
Exclusion Criteria:
Not provided
Not provided
Not provided
Not provided
Not provided
Not provided
| Name | Role | Phone | Extension | |
|---|---|---|---|---|
| Yunfei Ding, Master | Contact | 13521586952 | dingyunfei@pkuih.edu.cn | |
| zhoucang Zhang, Master | Contact | 17710230157 | zhangzhoucang@pkuih.edu.cn |
Not provided
| Facility | Status | City | State | ZIP | Country | Contacts |
|---|---|---|---|---|---|---|
| Peking University internation Hospital | Recruiting | Beijing | Beijing Municipality | 102206 | China |
| Type | Date | Date Unknown |
|---|---|---|
| Release | Jul 25, 2021 | |
| Reset | Aug 16, 2021 |
Not provided
Not provided
| Release Date | Unrelease Date | Unrelease Date Unknown | Reset Date | MCP Release Number |
|---|---|---|---|---|
| Jul 25, 2021 | Aug 16, 2021 |
Not provided
Not provided
Not provided
Not provided
Not provided