| Primary | The Mean Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Endpoint (either week 8 or the last observation after baseline) in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at both baseline and at least one time point after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks from start of study drug administration (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 | Placebo | Placebo tablets matching the 50 mg armodafinil tablet were used in a manner identical to that of the armodafinil tablets. Study drug was titrated up to the target dosage of 3 tablets / day (daily dose was administered each morning). Patients began taking blinded study drug at a dose of 1 tablet daily on the day following the baseline visit. Doses were increased by 1 tablet to a dose of 2 tablets/day on Day 2 and 3, and then again by 1 tablet /day on day 4 for a target dose of 3 tablets/day. Following titration, patients continued taking 3 tablets/day of study drug for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 2 tablets/day) was allowed. The dosage could not be increased after it was decreased. |
| | | Title | Denominators | Categories |
|---|
| | | Title | Measurements |
|---|
| - OG000-15.6± 1.32
- OG001-12.5± 1.34
|
|
| | Group IDs | Group Description | Statistical Method | Statistical Comment | P-Value | P-Value Comment | Parameter Type | Parameter Value | Dispersion Type | Dispersion Value | Confidence Interval Sides | Confidence Interval % | CI Lower Limit | CI Upper Limit | CI Lower Limit Comment | CI Upper Limit Comment | Estimate Comment | Tested Non-Inferiority | Non-Inferiority Type | Non-Inferiority Comment | Other Analysis Description |
|---|
| Least square (LS) mean and standard error of the LS mean for each treatment group and the p-value for the treatment comparison is from an analysis of variance (ANOVA) with treatment ands concurrent treatment for bipolar disorders as factors. A significant treatment-by baseline interaction was observed in the total score that violates the assumption of parallelism on which an ANCOVA is based, so the data was analyzed using ANOVA without baseline as a covariate rather than ANCOVA. | ANOVA | | 0.0439 | | | | | | | 95 | | | | | | No | Superiority or Other | | |
|
| Secondary | The Mean Change From Baseline to Week 1 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 1 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at both baseline and at week 1 after start of study drug administration | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 1 week following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Mean Change From Baseline to Week 2 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 2 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at baseline and at 2 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 2 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Mean Change From Baseline to Week 3 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 3 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at baseline and at 3 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 3 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Mean Change From Baseline to Week 4 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 4 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at baseline and at 4 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Mean Change From Baseline to Week 6 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 6 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed with the IDS-C30 at baseline and at 6 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 6 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Mean Change From Baseline to Week 8 in the 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data presented here summarizes the change from baseline to Week 8 in the total score of the IDS-C30. | Full analysis set defined as subjects who were assessed at baseline and at 8 weeks with the IDS-C30. | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Number of Patients Achieving Remission at Endpoint According to the 30-item Inventory of Depressive Symptomatology-Clinician-Rated (IDS-C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data here summarizes the number of subjects in each treatment group who achieved a remission (total score <=11). | Full analysis set defined as subjects who had completed IDS-C30 at baseline and at least one observation after baseline | Posted | | Number | | Participants | | Baseline, 4 and 8 weeks following start of study drug administration (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | |
|
| Secondary | Number of Patients Achieving "Response" at Endpoint According to the 30-item Inventory of Depressive Symptomatology-Clinician-Rated (IDS-C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data here summarizes the number of subjects in each treatment group who achieved a "response" (> 50% decrease from baseline in total score). | Full analysis set defined as subjects who were assessed by IDS-C30 at baseline, and at least one observation after baseline | Posted | | Number | | Participants | | Baseline, 4 and 8 weeks following start of study drug administration (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Number of Patients Achieving "Sustained Remission" at Endpoint According to the 30-item Inventory of Depressive Symptomatology-Clinician-Rated (IDS-C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data here summarizes the number of subjects in each treatment group who achieved a "sustained remission" (total score <= 11 that persists over the four week period from Week 4 to Week 8). | Full analysis set defined as subjects who were assessed by IDS-C30 at baseline, and at least one observation after baseline | Posted | | Number | | Participants | | Baseline, 4 and 8 weeks following start of study drug administration (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Number of Patients Achieving "Sustained Response" at Endpoint According to the 30-item Inventory of Depressive Symptomatology-Clinician-Rated (IDS-C30) | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. The data here summarizes the number of subjects in each treatment group who achieved a "sustained response" (> 50% decrease from baseline in total score that persisted over the four week period between Week 4 and Week 8). | Full analysis set defined as subjects who were assessed by IDS-C30 at baseline, and at least one observation after baseline | Posted | | Number | | Participants | | Baseline, 4 and 8 weeks following start of study drug administration (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) Combination of Items 1-3 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Items 1 - 3 assess sleep onset insomnia, mid-nocturnal insomnia, and early morning insomnia respectively each on a 0 - 3 scale. The data presented here summarizes the change from baseline to Endpoint in the combined score of these three items assessing insomnia. | Full analysis set defined as subjects who were assessed by IDS-C30 at baseline and at least one observation after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 4 on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) Combination of Items 1-3 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Items 1 - 3 assess sleep onset insomnia, mid-nocturnal insomnia, and early morning insomnia respectively each on a 0 - 3 scale. The data presented here summarizes the change from baseline to week 4 in the combined score of these three items assessing insomnia. | Full analysis set defined as subjects who were assessed by IDS C30 at baseline and Week 4 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 8 on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) Combination of Items 1-3 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Items 1 - 3 assess sleep onset insomnia, mid-nocturnal insomnia, and early morning insomnia respectively each on a 0 - 3 scale. The data presented here summarizes the change from baseline to week 8 in the combined score of these three items assessing insomnia. | Full analysis set defined as subjects who were assessed with IDS-C30 at baseline and at week 8 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) - Item 4 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Item 4 assesses hypersomnia on a scale from 0 (sleeps no longer than 7-8 hours a night) to 3 (sleeps longer than 12 hours in 24 hour period). The data presented here summarizes the change from baseline to Endpoint in the score of Item 4 assessing hypersomnia. | Full analysis set defined as subjects assessed with IDS-C30 at baseline and at least one observation after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 4 on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) - Item 4 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Item 4 assesses hypersomnia on a scale from 0 (sleeps no longer than 7-8 hours a night) to 3 (sleeps longer than 12 hours in 24 hour period). The data presented here summarizes the change from baseline to week 4 in the score of Item 4 assessing hypersomnia. | Full analysis set defined as subjects assessed with IDS-C30 at baseline and at week 4 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 8 on 30 Item Inventory of Depressive Symptomatology Clinician Rated (IDS C30) - Item 4 | The IDS C30 is a standardized 30 item, clinician rated, scale to assess the severity of a patient's depressive symptoms. The scale uses the 9 symptom domains of the DSM-IV criteria to measure symptom severity. The scores range from a minimum of 0 to a maximum score of 84. The higher the score the more severe the symptoms of depression. Item 4 assesses hypersomnia on a scale from 0 (sleeps no longer than 7-8 hours a night) to 3 (sleeps longer than 12 hours in 24 hour period). The data presented here summarizes the change from baseline to week 8 in the score of Item 4 assessing hypersomnia. | Full analysis set defined as subjects who were assessed with IDS-C30 at baseline and at week 8 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) in the Montgomery-Asberg Depression Rating Scale (MADRS) Total Score | The MADRS is a 10-item scale to evaluate the overall severity of a patient's depressive symptoms, that is completed by the physician. The rating scale makes use of both observational clues as to the subject's level of depression (eg. apparent sadness) and verbal indicators of depression expressed by the patient. Each of the 10 items is graded on a 6-point scale with anchors at 2 point intervals. Total scores range from 0 to 60, with the higher number indicating more severe symptoms of depression. Here we present data summarizing the change in MADRS from Baseline to Endpoint. | Full analysis set defined as subjects who had both a baseline observation and at least one observation after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and Endpoint (8 weeks following the start of study drug administration or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 4 in the Montgomery-Asberg Depression Rating Scale (MADRS) Total Score | The MADRS is a 10-item scale to evaluate the overall severity of a patient's depressive symptoms, that is completed by the physician. The rating scale makes use of both observational clues as to the subject's level of depression (eg. apparent sadness) and verbal indicators of depression expressed by the patient. Each of the 10 items is graded on a 6-point scale with anchors at 2 point intervals. Total scores range from 0 to 60, with the higher number indicating more severe symptoms of depression. Here we present data summarizing the difference in MADRS score from Baseline to Week 4. | Full analysis set defined as subjects who were assessed by MADRS at both baseline and at Week 4 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 8 in the Montgomery-Asberg Depression Rating Scale (MADRS) Total Score | The MADRS is a 10-item scale to evaluate the overall severity of a patient's depressive symptoms, that is completed by the physician. The rating scale makes use of both observational clues as to the subject's level of depression (eg. apparent sadness) and verbal indicators of depression expressed by the patient. Each of the 10 items is graded on a 6-point scale with anchors at 2 point intervals. Total scores range from 0 to 60, with the higher number indicating more severe symptoms of depression. Here we present data summarizing the difference in MADRS score from Baseline to Week 8. | Full analysis set defined as subjects who were assessed by MADRS at both baseline and at Week 8 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Endpoint (Week 8 or last observation after baseline). | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at least one observation after baseline. | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 1 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 1 | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at 1 week | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 1 week following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Week 2 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 2 | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at 2 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 2 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Week 3 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 3. | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at week 3 | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 3 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Week 4 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 4. | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at 4 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Week 6 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 6. | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at 6 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 6 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Week 8 in the Quick Inventory of Depressive Symptomatology - 16 Items (QIDS-SR16) | The QIDS-SR16 is a 16-item rating scale of depressive symptoms completed by the patient at each visit. It is a shorter version of the IDS-C30 that is completed by the patient rather than the examiner. The total score ranges from 0 to 27 (higher score signifies more severe depression) and is obtained by adding the scores for each of the 9 depression symptom domains of the DSM IV. The data presented here summarizes the change in QIDS-SR16 from Baseline to Week 8. | Full analysis set defined as subjects who completed the QIDS-SR16 at baseline and at 8 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to Endpoint (Week 8 or Last Observation After Baseline) in the Quality of Life Enjoyment and Satisfaction Questionnaire - Short Form (Q-LES-Q-SF) | The Q-LES-Q-SF is an instrument designed to measure general activities of daily living. It is a patient-rated quality of life questionnaire and consists of 16 items, but only the first 14 are included in the total score. Each item is rated by the patient on a scale from 1 - 5 (1=very poor, 2=poor, 3=fair, 4=good, and 5=very good). The minimum score is 14 and the maximum score is 70, with lower scores indicating poorer quality of life. The data presented here summarizes the change in score from baseline to endpoint (8 weeks or last observation after baseline). | Full analysis set defined as subjects who completed the questionnaire at baseline and at any appropriate time point after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to Week 4 in the Quality of Life Enjoyment and Satisfaction Questionnaire - Short Form (Q-LES-Q-SF) | The Q-LES-Q-SF is an instrument designed to measure general activities of daily living. It is a patient-rated quality of life questionnaire and consists of 16 items, but only the first 14 are included in the total score. Each item is rated by the patient on a scale from 1 - 5 (1=very poor, 2=poor, 3=fair, 4=good, and 5=very good). The minimum score is 14 and the maximum score is 70, with lower scores indicating poorer quality of life. The data presented here summarizes the change in score from baseline to 4 weeks. | Full analysis set defined as subjects who completed the questionnaire at baseline and at 4 weeks. | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | |
|
| Secondary | Change From Baseline to Week 8 in the Quality of Life Enjoyment and Satisfaction Questionnaire - Short Form (Q-LES-Q-SF) | The Q-LES-Q-SF is an instrument designed to measure general activities of daily living. It is a patient-rated quality of life questionnaire and consists of 16 items, but only the first 14 are included in the total score. Each item is rated by the patient on a scale from 1 - 5 (1=very poor, 2=poor, 3=fair, 4=good, and 5=very good). The minimum score is 14 and the maximum score is 70, with lower scores indicating poorer quality of life. The data presented here summarizes the change in score from baseline to 8 weeks. | Full analysis set defined as subjects who completed questionnaire at baseline and at 8 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | |
|
| Secondary | Change From Baseline to Endpoint (8 Weeks or Last Observation After Baseline) in Hamilton Anxiety Scale (HAM-A) Total Score | The HAM-A is a clinician-rated 14 item scale that provides an overall measure of global anxiety, including psychic (mental agitation and psychological distress) and somatic (physical complaints related to anxiety) symptoms. Each item is scored on a scale of 0 (not present) to 4 (severe), with a total score range of 0 - 56, where less than 17 indicates mild anxiety, 18 - 24 mild to moderate anxiety, 25-30 moderate to severe, >30 very severe. The data presented here summarizes the change in HAM-A score from Baseline to Endpoint (8 weeks or last observation after baseline). | Full analysis set defined as subjects who completed the HAM-A at baseline and at least once after baseline | Posted | | Least Squares Mean | Standard Error | Units on a scale | | baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | Change From Baseline to 4 Weeks in the Hamilton Anxiety Scale (HAM A) Total Score | The HAM-A is a clinician-rated 14 item scale that provides an overall measure of global anxiety, including psychic (mental agitation and psychological distress) and somatic (physical complaints related to anxiety) symptoms. Each item is scored on a scale of 0 (not present) to 4 (severe), with a total score range of 0 - 56, where less than 17 indicates mild anxiety, 18 - 24 mild to moderate anxiety and 25-30 moderate to severe. The data presented here summarizes the change in HAM-A score from Baseline to 4 Weeks | Full analysis set defined as subjects who completed the HAM-A at baseline and at 4 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | Change From Baseline to 8 Weeks in the Hamilton Anxiety Scale (HAM A) Total Score | The HAM-A is a clinician-rated 14 item scale that provides an overall measure of global anxiety, including psychic (mental agitation and psychological distress) and somatic (physical complaints related to anxiety) symptoms. Each item is scored on a scale of 0 (not present) to 4 (severe), with a total score range of 0 - 56, where less than 17 indicates mild anxiety, 18 - 24 mild to moderate anxiety and 25-30 moderate to severe. The data presented here summarizes the change in HAM-A score from Baseline to 8 Weeks | Full analysis set defined as subjects who completed the HAM-A at baseline and at 8 weeks | Posted | | Least Squares Mean | Standard Error | Units on a scale | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. | | OG001 |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Endpoint (Week 8 or Last Observation After Baseline) | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Endpoint are presented. | Full analysis set defined as subjects assessed by CGI-BP at Baseline and at least one observation after Baseline. | Posted | | Number | | Participants | | Baseline and 8 weeks (or last observation after baseline) | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 1 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 1 are presented. | Full analysis set defined as subjects who were assessed by CGI-BP at Baseline and Week 1 | Posted | | Number | | Participants | | Baseline and 1 week following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 2 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 2 are presented. | Full analysis set defined as subjects who were assessed by CGI-BP at baseline and week 2 | Posted | | Number | | Participants | | Baseline and 2 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 3 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 3 are presented. | Full analysis set defined as subjects who were assessed by CGI-BP at baseline and at 3 weeks | Posted | | Number | | Participants | | Baseline and 3 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 4 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 4 are presented. | Full analysis set defined as subjects who were assessed with CGI-BP at baseline and at 4 weeks | Posted | | Number | | Participants | | Baseline and 4 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 6 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 6 are presented. | Full analysis set defined as subjects who were assessed by CGI-BP at baseline and at Week 6 | Posted | | Number | | Participants | | Baseline and 6 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|
| Secondary | The Number of Responders According to the Clinical Global Impression of Change - Bipolar Version (CGI BP) Measure of Depression at Week 8 | CGI-BP is a standardized, clinician-rated assessment which allows the clinician to rate the bipolar illness at various time points compared with baseline. At Screening and Baseline visits the physician rated the severity of the illness using 7 categories (1=normal through 7=very severely ill). At subsequent visits the clinician assessed the change in severity of the condition using 7 categories (1=very much improved through 7=very much worse). Subjects were considered responders if they had a rating of "much improved" or "very much improved". The number of responders at Week 8 are presented. | Full analysis set defined as subjects who were assessed with CGI-BP at baseline and at week 8 | Posted | | Number | | Participants | | Baseline and 8 weeks following the start of study drug administration | | | | ID | Title | Description |
|---|
| OG000 | Armodafinil 150 mg/Day | Armodafinil was titrated up to the target dosage of 150 mg/day (daily dose was administered each morning). Patients began taking blinded armodafinil at a dose of 50 mg/day (1 tablet) on the day following the baseline visit. Doses were increased by 50 mg/day (1 tablet) to a dose of 100 mg/day on Day 2 and 3, and then again by 50 mg /day on day 4 for a target dose of 150 mg/day. Following titration, patients continued taking 150 mg/day of armodafinil for the duration of the study. If a patient was unable to tolerate (recurrent or persistent adverse events) the study drug, 1 reduction in dosage (ie, minimum dosage 100 mg/day [2 tablets]) was allowed. The dosage could not be increased after it was decreased. |
|